Vietnamese
Search Engine

Latest News
ICOLD President‘s New Year 2017 Message
Professor Emeritus Ray W. Clough passed away
Criteria for the selection of dam types in areas of high seismicity
Registrations for the 3rd International Workshop ‘PKW 2017’
Bangkok admits inability to regulate new Lao dam
Technical Design of the Lai Chau Hydropower Project is awarded by ACECC
Condolences to New Zealand Colleagues
Agricultural water service pricing & PPP models
Agricultural Water Service Pricing
3rd International Workshop on Labyrinth and Piano Key Weirs,
Numerical modelling for reservoir sediment management
An Initiative to Improve Dam and Downstream Community Safety in Vietnam
Policy design under present hydrological conditions
Magnitude-6.3 earthquake near Tainan (Taiwan)
Development of process-oriented soil erosion model and uncertainty assessment of modle outputs
Eco-friendly germination promoting vegetation mat manufacturing technology
A chance to reduce coal share in the Vietnam power mix toward sustainable development
Integrated and Sustainable Water Management of Red-Thai Binh River System in a Changing Climate.
Climate change and design criteria of structural measures for natural disasters
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Water & Environment
Send this article

Policy design under present hydrological conditions
Reconnaissance, Modelingthe system, Indicators identification

Policy design under present

hydrological conditions


Rodolfo Soncini Sessa

DEI – Politecnico di Milano

 

(The IMRR Project

Integrated and Sustainable Water Management

of Red-Thai Binh River System in a Changing Climate

The previous part can be found in this website, page

en/Web/Content.aspx?distid=640 )

 

…IMRR phases:

 

Reconnaissance

Modelingthe system

Indicators identification

Scenarios definition

Alternative design

Evaluation

Comparison…

 

 

 

 


 

Please find the full article enclosed!

Veuillez trouver ci-joint ce plein article!



Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To