Vietnamese
Search Engine

Latest News
Registrations for the 3rd International Workshop ‘PKW 2017’
Bangkok admits inability to regulate new Lao dam
Technical Design of the Lai Chau Hydropower Project is awarded by ACECC
Condolences to New Zealand Colleagues
Agricultural water service pricing & PPP models
Agricultural Water Service Pricing
3rd International Workshop on Labyrinth and Piano Key Weirs,
Numerical modelling for reservoir sediment management
An Initiative to Improve Dam and Downstream Community Safety in Vietnam
Policy design under present hydrological conditions
Magnitude-6.3 earthquake near Tainan (Taiwan)
Development of process-oriented soil erosion model and uncertainty assessment of modle outputs
Eco-friendly germination promoting vegetation mat manufacturing technology
A chance to reduce coal share in the Vietnam power mix toward sustainable development
Integrated and Sustainable Water Management of Red-Thai Binh River System in a Changing Climate.
Climate change and design criteria of structural measures for natural disasters
Study on the Impacts of Mainstream Hydropower on the Mekong River (Volume 2)
Study on the Impacts of Mainstream Hydropower on the Mekong River(Volume 1)
Mekong Story Funds
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Documents
Send this article

A chance to reduce coal share in the Vietnam power mix toward sustainable development
Power development plays a very important role in a country’s economy development, as well as assur ance of social welfare and national security. Revised Law of Electricity required that electricity planning have to be synchronized with power sources planning while considering renewable and sustainable energy sources

A chance to reduce coal share

in the Vietnam power mix

toward sustainable development


Power development plays a very important role in a country’s economy development, as well as assur ance of social welfare and national  security. Revised Law of Electricity required that electricity planning have to be synchronized with power sources planning while considering renewable and sustainable energy sources. Concurrently, the planning must show the connection between local planning and national planning. It must be effective and feasible for investment, and appropriate for sustainable development and environmental  security.

Power  Development  Plan  VII  (PDP  VII)  was  approved  by  Prime  Minister  by  Decision  1208/QD.TTg released on July 21st 2011 which has been activate for over 3 years.

Please find the full article enclosed!

Veuillez trouver ci-joint ce plein article!

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To