Vietnamese
Search Engine

Latest News
Earthquake: M7.1 Puebla (Mexico) 19‐9‐17
Current Status of Vietnam Coastal Erosion and Major Measures for Mitigation-Case Study: Thanh Hoa Province
Rainfall Prediction System for the CuaDat Dam Basin
Climate Change, Water and Hydropower
Some pictures of Asphalt Core Embankment Dams
The advent of Geomembrane Faced Earth and Rock Dams (GFRD)
An efficient warning system of flash flood for Vietnam
Climate change in Vietnam and response
Seventh International Conference and Exhibition on Water Resources and Renewable Energy Development in Asia
Coastal disasters and mitigation measures in Vietnam
Mekong survey draws protests
Urban Resilience in Vietnam
Twenty years of research in Biskra University for Labyrinths, Piano Key Weirs and associated Fuse plugs
MRC SEA of Hydropower on the Mekong Mainstream Lao PDR
Sharing the river management experiences in Korea: Past, present and future
ICOLD President‘s New Year 2017 Message
Professor Emeritus Ray W. Clough passed away
Criteria for the selection of dam types in areas of high seismicity
Registrations for the 3rd International Workshop ‘PKW 2017’
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Water & Environment
Send this article

Laos is Ignoring Significant Concerns of its Neighbours on Mekong Dams
The charade over whether to proceed with Don Sahong Dam, the second Mekong mainstream hydropower project near the Laotian-Cambodian border, will soon reach a defining moment.

Laos is Ignoring Significant Concerns

of its Neighbours on Mekong Dams


Ame Trandem

 

The charade over whether to proceed with Don Sahong Dam, the second Mekong mainstream hydropower project near the Laotian-Cambodian border, will soon reach a defining moment.

On Wednesday, Cambodia, Laos, Thailand and Vietnam are expected to bring to a close the Mekong River Commission's six-month prior consultation process for the project. The future of the Mekong hangs precariously on what happens next.

The Don Sahong Dam's prior consultation process required the four countries to conduct due diligence on the dam's impacts on the Mekong River and cooperate in "good faith" to reach agreement over whether to build the project. Despite the opportunities this initiative presents, the consultation process has been widely viewed as little more than a diplomatic charade.

Failed process

Laos made it clear from the start that the dam would be built and that the process will at best serve to help improve its design. This political maneuvering to exclude neighboring countries from the decision to build the project on a river shared by

more than 60 million people makes it clear that Laos is not acting in "good faith" and is intent on following the same failed process of Xayaburi Dam, in which Laos proceeded unilaterally, ignoring the significant concerns raised by its neighbors and their requests for more study and consultation.

Laos made the decision before necessary baseline and transboundary impact assessments, which are imperative for any decisions on the dam, had been carried out.

The Mekong River Commission - the body assigned to ensure regional cooperation for the Mekong - is going through an existential crisis. Xayaburi Dam served as the first real test for the commission, and it's widely acknowledged that the body lacked the political will to address the unilateral actions taken by the Lao government.

Don Sahong has now repeated this flawed process, ensuring that confidence in the commission to work for the common interest of the Mekong region has reached an all-time low.

The implications of the laissez-faire approach towards the future of the Mekong River are chilling. Scientific studies have overwhelmingly demonstrated that a healthy Mekong is irreplaceable, for the region's rich inland fisheries and the food security it provides.

Food security calamity

Should the cascade of 11 mainstream dams be built, vital migration routes of the world's largest inland fisheries would be blocked, along with sediment flows necessary for replenishing nutrients to the region's farms and paddy fields, forcing the Mekong region perilously close to a food security calamity. Research by Cambodia's Fisheries Administration, WWF and Australian National University has demonstrated that the protein, micronutrients and calories associated with the river's fisheries cannot easily be replaced.

Don Sahong would be built across the Mekong's Hou Sahong Channel, the main waterway supporting year-round fish migration. While Malaysian developer Mega-First Corporation has proposed to re-engineer nearby channels for alternative fish passageways, the actual designs and fish monitoring methods have not been made public nor has exhaustive testing been carried out, rendering the mitigation proposal extremely risky.

With more than 100,000 truckloads of bedrock to be excavated to increase flows into the Hou Sahong Channel, one of the last remaining pools of the critically endangered Irrawaddy dolphin will also likely be wiped out. With the Mekong fisheries and the region's food security at stake, Laos has failed to consider what will happen if the proposed mitigation measures don't work.

Reckless, irresponsible

With such high risks for the Mekong and its people, its clear proceeding with Don Sahong at this point in time is both reckless and irresponsible. The absence of a strong foundation with which to evaluate the transboundary impacts of the project and reach agreement on whether to proceed with it demonstrates that the prior consultation process must be urgently reformed.

The four countries should seek to extend the process indefinitely as they bring forward their positions on Don Sahong Dam. With the future of the river lying in the hands of riparian governments, its time the four governments act responsibly, end their diplomatic charade and back their rhetoric with action.

Construction towards Don Sahong Dam must be immediately halted and sufficient studies on the project's impacts must be carried out. The burden of proof that the project's impacts will be limited and mitigation measures will succeed must be on the developer. Agreement must then be reached among all four countries - and their people - before proceeding.

The free reign of Mekong mainstream dam building must end now.

Ame Trandem is the Southeast Asia programme director for International Rivers, an INGO working to protect rivers and the rights of communities depending upon them.

 

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To