Vietnamese
Search Engine

Latest News
Mekong survey draws protests
Urban Resilience in Vietnam
Twenty years of research in Biskra University for Labyrinths, Piano Key Weirs and associated Fuse plugs
MRC SEA of Hydropower on the Mekong Mainstream Lao PDR
Sharing the river management experiences in Korea: Past, present and future
ICOLD President‘s New Year 2017 Message
Professor Emeritus Ray W. Clough passed away
Criteria for the selection of dam types in areas of high seismicity
Registrations for the 3rd International Workshop ‘PKW 2017’
Bangkok admits inability to regulate new Lao dam
Technical Design of the Lai Chau Hydropower Project is awarded by ACECC
Condolences to New Zealand Colleagues
Agricultural water service pricing & PPP models
Agricultural Water Service Pricing
3rd International Workshop on Labyrinth and Piano Key Weirs,
Numerical modelling for reservoir sediment management
An Initiative to Improve Dam and Downstream Community Safety in Vietnam
Policy design under present hydrological conditions
Magnitude-6.3 earthquake near Tainan (Taiwan)
 Weather
Hà Nội28°C
Hải Phòng27°C
Huế29°C
TP Hồ Chí Minh31°C
Ðà Nẵng30°C
 Visitted Number
        
 
Dams in Vietnam
Send this article

Dinh Binh (Vietnam) RCC Dam.
-

Dinh Binh (Vietnam) RCC Dam



Dinh Binh RCC Dam
on the Kon River is located in the Binh Dinh Province, Central Vietnam. It creates  a multipurpose reservoir for downstream flood mitigation, irrigation (3.4 mil. hectares of cultivated land), water supply, power generation (capacity 6.6MW), environment promotion,…. Water storage volume is 226 mil. m3. The RCC dam volume is of 430,000 m3. The RCC dam height is 54m. The dam crest length is 611m.. The technical design was done by the Vietnam Hydraulic Consultant Company NO1. The chief contractor are Engineering Construction Corporation NO47.

The ground breaking was early in May 2002 so that the Dinh Binh becomes the first RCC dam in Vietnam. The completion is planned in December 2007.

Please click here to view detail (PDF, 263 KB).

Give your comments 

Newer post
Older posts
Eurowindow có 5 nhà máy và 1 trung tâm kính đặt tại Hà Nội, Đà Nẵng, Bình Dương. Thương hiệu Eurowindow nhiều năm liền đạt Giải vàng chất lượng Việt Nam. Eurowindow luôn cam kết cung cấp cho khách hàng những sản phẩm có chất lượng tốt nhất. Sản phẩm chất lượng tốt, đội ngũ nhân viên có chuyên môn cao, phong cách phục vụ chuyên nghiệp, đó là các yếu tố quyết định sự thành công của thương hiệu Eurowindow.
Spotlight
Vietnam Vice PM's Welcome Message
The ICOLD Committee on “Dams for Hydroelectric Energy”
Prof. Jinsheng JIA’ s Letter
Long report of the Int. Symposium “ASIA 2008” on “Water Resources & Renewable Energy Development in Asia”.
Welcome to Vietnam! Bienvenu au Vietnam!
Advanced Technology of "Tyco Water".
Vietnam Country Update & Hydro Power Development Plant
ASIA 2008 OPENING
H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium “ASIA 2008 -Water Resources & Renewable Energy Development in Asia”
Address of H.E. Vice Prime Minister Hoang Trung Hai at the Opening Ceremony of the Symposium "ASIA 2008"
Long-term Cooperation between VNCOLD & CHINCOLD
Some images of Son La Hydropower Project.
Ham Thuan - Da Mi Hydropower Project.
VNCOLD Central Officers.
Interaction between morphology change & salinity distribution in the Dinh An Estuary, Vietnam.
Dinh Binh (Vietnam) RCC Dam.
Flood Mitigation Strategy for Sustainability in Vietnam.
Connected To